Schachtdeckel 16-9

Lifting manhole covers safely.

Unbelievable but true: Until 1903, the maximum load that a person was allowed to carry in Switzerland was 125 kilograms! The Federal Council then set appropriate limits. As a rule, the manual lifting of loads should be kept to a minimum and mechanical aids should be used whenever possible. The manhole covers that our employees move several times a day weigh up to 430 kilograms. It is therefore a matter of extreme importance for cablex and the safety managers in the BSE unit to always refer people to suitable lifting equipment and the right technology.

Carolin Rabea Primerova 1-1
12.11.2020
Author Carolin Rabea Primerova

Schachtdeckel heben (DE).

If you are lifting heavy loads such as manhole covers on your own, it is essential to ensure that the correct technique is used. 

Young employees in particular posses the necessary fitness and muscular power to move even heavy loads on their own. However, the frequent, difficult and incorrect lifting and carrying of loads can cause damage to muscles and wear to the skeleton. Most people only feel the consequences years later.  

Physical strain with poor posture is a major cause of musculoskeletal ailments; in the worst cases, the pain can mean that employees are unable to work. With respect to employers, damage to the musculoskeletal system accounts for an estimated one third of all employee absences and is responsible for costs totalling more than three billion Swiss francs per year.

In general, men should lift a maximum of 25 kilograms and women a maximum of 15 kilograms. Our cablex colleagues who work in the field exceed this maximum limit every day. People with well-trained muscles who are in good physical shape and who are experienced can also carry heavier loads than those indicated in the table.

Infografik - Source

Generally speaking, our employees not only have well-trained and developed muscles; they also perfect the correct lifting and carrying technique. This is demonstrated and taught in e-learning sessions.

The degree of stain results from the following factors:

  • load weight/lifting time
  • posture, physique, current condition of the person lifting
  • external conditions when lifting

When lifting large manhole covers weighing up to 300 kilograms, cablex safety officers recommend using a tandem lifter. This device allows the weight of a manhole cover to be comfortably distributed between two people. Its optimal power transmission facilitates lifting and setting down and helps protect the back. The tandem lifter is suitable for use on streets and open ground.

Deckel Ziehen 16-9

If you are lifting heavy loads such as manhole covers on your own, it is essential to ensure that the correct technique is used. This is the only way to protect the intervertebral discs and the entire musculoskeletal system. Lifting with a bent back puts adverse strain on the intervertebral discs and can cause back problems.

Therefore, the following generally applies:

  • lift from a squatting postilion
  • maintain an upright position when lifting (DON'T bend!)
  • share heavy, bulky loads
  • work gloves and safety shoes S3 reduce the risk of accidents
  • distribute loads evenly whenever possible
Haltung 16-9
Ein Monteur installiert die INFRABOX

The INFRABOX makes mobile communication systems intelligent.

The smart little box enables digital remote reading and control of the infrastructure and facilitates maintenance.

Carolin Rabea Primerova 1-1
Three cablex employees who work flexibly for the company.

How ‘performing together’ works in Ticino

The small region in the south is particularly reliant on the flexibility of its employees.

Carolin Rabea Primerova 1-1
cablex Mitarbeiter lädt sein E-Fahrzeug

E-cars for a better environment: the sustainable strategy of cablex.

Our cablex workforce is already travelling to customer locations in a very sustainable manner with almost 1,000 electric vehicles.

Martina Strazzer 1-1
Beleuchtete Autobahn bei Nacht_24-9.jpg

Transport.

Creating a future-proof infrastructure with cablex.

24-9 Ausbau E-Ladestation Header

cablex is expanding the charging infrastructure for electric vehicles at all locations.

cablex is expanding the charging infrastructure for electric vehicles at all its locations – a service that we also offer externally to our customers.

Larissa Mihalik 1-1
Portes ouvertes Header 24-9

Open house day - bienvenue à Penthalaz!

On 20 and 21 September, cablex opened its doors at the Penthalaz site to customers, partners, interested parties, employees and their families.

Larissa Mihalik 1-1
3-4 kopa

Plan construction projects sustainably and save costs.

Das Ziel ist, sich zukünftig mit anderen Unternehmen abzusprechen und die Rohre für Wasser, Energie und Telekommunikation in einem gemeinsamen Bauvorhaben zu realisieren.

Carolin Rabea Primerova 1-1
cablex Academy 24-9

cablex Academy.

The cablex Academy teaches specialist skills (competences) in the fields of network construction, service and installation. Here, focus is on the area of network construction for telecommunication.

Hero Smart Meter 24-9

Intelligent energy meters from smart cablex.

Smart meters make it possible to check electricity consumption remotely at any time

Wladimir Kiselew im Rosenbergtunnel

cablex handles complex switchovers in the Rosenberg tunnel.

Tunnel renovations are part of daily operations of the infrastructure segment of cablex AG. Cablex was responsible for the preliminary measures in the Rosenberg tunnel in St. Gallen.

Carolin Rabea Primerova 1-1
Im Rahmen eines Pilotprojektes stattete cablex in den letzten Monaten Swisscom Zentralen mit Photovoltaikanlagen aus.

Customised photovoltaic expansion for Swisscom central offices.

As part of a pilot project, cablex has equipped Swisscom control centres with photovoltaic systems in recent months.

Carolin Rabea Primerova 1-1

cablex AG

Tannackerstrasse 7

3073 Gümligen

cablex.info@cablex.ch

0800 222 444